Case Studies
Real projects, real constraints, and real outcomes. See how Fencepac delivers for tier-1 contractors and government clients across Queensland.

Coomera North (Stage 1) — Noise Barriers
Fencepac was engaged by the Acciona Georgiou Joint Venture to deliver the design, supply, and construction of noise barriers as part of the Coomera Connector Stage 1 project. The works formed a critical component of a major transport infrastructure corridor, requiring coordination across multiple stakeholders, strict compliance standards, and integration with concurrent civil works.
Read Full Case Study
Palm Beach to Tugun (PB2T) – Noise Barriers Package
Full lifecycle delivery of noise barriers including design development and certification of noise wall systems, manufacture and installation of concrete panels, construction of bored pile foundations and in-situ concrete sills, and coordination with other contractors for footing works and interface zones. All works delivered in compliance with TMR specifications and stringent quality requirements.
Read Full Case Study
Lotus Glen Correctional Facility
Fencepac partnered with Thiess to design, innovate and construct prison-standard security fencing for a new extension, and an existing refurbished section, of the Lotus Glen Correctional Facility. The project comprised multiple fencing applications including high chainwire, weldmesh and razor wire fencing, visual barriers, enclosures, electric and manual gates, and dog pound fencing.
Read Full Case Study
Redlands Business Park
Design and construct 1,466m² of segmental concrete crib retaining walls up to 6.0m high including site set out, preparatory and foundation excavation, installation of durable wall components designed to provide 60 years of structural integrity.
Read Full Case Study
Aurora Ripley
Design and construct 2,143m² of acoustic barriers ranging in height from 2m to 5.5m, along with 56m² of retaining wall to complement the project. Scope included comprehensive design tailored to meet acoustic performance, structural stability, and aesthetic requirements.
Read Full Case Study
Edmonton to Gordonvale Bruce Highway
Supplied and installed 330m of durable concrete rail corridor barrier to meet stringent safety and engineering standards. Designed and reconstructed a timber noise barrier to integrate with the existing wall, ensuring consistent acoustic performance and visual alignment.
Read Full Case Study
Currell Circuit, Samford Valley
Design and construct of a reinforced earth Keystone Elite masonry retaining wall to remediate a significant 2022 slope failure at a residential property. Wall approximately 90m in length and up to 3.5m in height, stabilising the dwelling and protecting an estimated asset value in excess of $2.5M.
Read Full Case Study
Holmview Central Shopping Centre
Design and construct of a 7m-high reinforced earth masonry wall for access to a shopping centre's click-and-collect facility. Scope included geotechnical investigation, detailed design, and construction of a high-quality retaining structure to support heavy vehicle access.
Read Full Case Study
Wacol DPSOA Security Fencing
Design and construct a 3-metre high Bluedog fence with a 6-metre wide tracked sliding gate system and a 12-metre swing gate. Additionally, removal and reinstallation of the existing chainwire perimeter fence at a live correctional facility.
Read Full Case Study
Field of Dreams, Swanbank
Full masonry segmental earth-reinforced retaining wall for a large industrial lot — engineered to handle a punishing 60KPa load from heavy buildings and vehicles, while still complementing the surrounding development.
Read Full Case Study
Brisbane Immigration Transit Accommodation
Supply and install 358 mesh with security barrel, upgrade existing fencing with Bluedog anti-rollers, and provide secure gates including emergency service access at a live immigration facility.
Read Full Case Study
APLNG Gas Processing Facilities
15km of security fencing and gates, 8km of rural fencing, 29 fire exit gates, and 20 double gates delivered across 5 concurrent compressor station sites as part of a world-first CSG-LNG project. Up to 180 variations managed across sites up to 200km apart.
Read Full Case Study
Gold Coast Light Rail Stage 2
Supply and construct 20,000m² of concrete and acrylic noise barriers on an active highway corridor. 3,535 concrete panels and 971 acrylic acoustic panels shipped from Europe with a 3-month lead time. Approximately 130 contract variations managed through daily design changes from stakeholders.
Read Full Case Study
New Generation Rolling Stock (NGRS) Stabling Yard
Design and construct high-security fencing, gates, and 5 purpose-built storage sheds for a stabling yard servicing up to 100 trains daily. Scope included 358 mesh with koala barrier and anti-dig footing, concrete acoustic fencing, hydraulic curtain gates, and boom gates.
Read Full Case Study
Powerlink Substation Security Upgrades
Consult, design and construct security fencing across 24 substations. Scope included 6km of trenching with conduit, 150 cable pits, 120 concrete slabs, 30 new pedestrian gates, 1km mowing strip, earthing grid extensions, and replacement of 4km chainwire fencing and 100 gates.
Read Full Case Study
QR Feeder Stations and Stabling Yards
Security fencing upgrades, vibration fence detection system, security lighting, and CCTV at 8 stabling yards and 5 feeder stations. All works delivered on a live track network with minimal service disruption. Co-designed an innovative dual-material anti-vandal barrier to address millions in annual vandalism costs.
Read Full Case Study
SEQ Stabling Yard Project
Construct security fencing for 4 new purpose-built Queensland Rail stabling yards and associated infrastructure. Scope included perforated-mesh security sheeting sourced overseas and noise barrier design added outside original scope.